Project Management in Construction M: 7019944355

Image
Need Answer Sheet of this Question paper Contact us at answersheethelp@gmail.com M: 7019944355 Project Management in Construction Q1. It included Manpower, material and machinery that is necessary to perform the work: a. Scope b. Quality c. Resources d. Completion time Q2. In this analysis a project is formulated and appraised based on the estimates generated from past data, experience & analysis. a. Risk analysis b. Sensitivity analysis c. Probability analysis d. Economic analysis Q3. It is a verbal written or on-line document that shows the up-to-date performance status of a task that has been entrusted to a responsibility/accounting centre. a. Trends Forecasting b. Reporting Performance c. Performance Variance Analysis d. Recording Performance Q4. In this contract, the architectural and engineering design and drawings are  provided by the Employer/Client to the contractor at the time of tendering as a part of the contra...